Traffic

Actions

Florida Department of Transportation issues Big Bend traffic advisory for week of Oct. 16

road work
Posted at
and last updated

CHIPLEY, Fla. — Drivers will encounter traffic disruptions on the following state roads in the Big Bend area as crews perform construction and maintenance activities.

Leon County:

  • Orange Avenue/Lake Bradford Road (State Road (S.R.) 371) Resurfacing from Rankin Avenue to Stadium Drive – Motorists may encounter intermittent daytime and nighttime lane closures on the following roads:
    • Lake Bradford Road from Stadium Drive to Springhill Road Monday, Oct. 17 through Friday, Oct. 21 from 8 a.m. to 4:30 p.m. for utility work.
    • Lake Bradford Road from Stadium Drive to Springhill Road Sunday, Oct. 16 through Thursday, Oct. 20 from 8 p.m. to 6 a.m. for striping operations.
  • Apalachee Parkway (U.S. 27) Bridge Replacement for the Florida, Georgia, and Alabama Railroad - Motorists will encounter inside lane closures between Myers Park Drive and South Franklin Boulevard. One outside lane will remain open to traffic as construction continues on the bridge.
  • U.S. 90 Bridge Replacement over Ochlockonee River – Motorists will encounter intermittent lane closures Monday, Oct. 17 through Friday, Oct. 21 from 8 a.m. to 5 p.m. for striping operations.

Wakulla County:

  • U.S. 98 Coastal Highway Bike Path – Motorists may encounter intermittent laneclosures between Tower Road and Chattahoochee Street Monday, Oct. 17 through Friday, Oct. 21 from 8 a.m. to 5 p.m. The westbound lane will be closed to allow crews to construct the boardwalk. This work will require flagmen to direct drivers through the work zone.