VALDOSTA, Ga. (WTXL)-- The City of Valdosta Stormwater Division is working to repair the catch basin on the corner of North Patterson and College Streets this week.
The construction will shift traffic to the outside travel lane and will require a lane shift for southbound traffic.
According to the city, the work will take place between 9:00 AM and 3:00 PM each day, with the lane reopening at the end of that shift.
There will be traffic control devices in place during work hours to alert motorists of the work and traffic will be detoured accordingly.
The city asks anyone traveling near the area at these times to use caution.